Skip to content

M&MC RR Nov 2013 Update

by Mike Costello on November 12th, 2013

The contruction crews on the M&MC RR have been working overtime lately. Below are some pictures.

 

Except for the engine service area this end of the yard is complete.

Except for the engine service area this end of the yard is complete.

Since the August viewing a new peninsula has appeared.

Peninsula

East end of Biddeford. Lower staging entrance visable on the right.

East end of Biddeford. Lower staging entrance visable on the right.

West end of Biddeford. Lower staging yard is visible on the left.

West end of Biddeford. Lower staging yard is visible on the left.

Staging yard tracks 1-10.

Staging yard tracks 1-10.

Staging yard tracks 11-20.

Staging yard tracks 11-20.

Ossipee cutoff from main line to staging.

Ossipee cutoff from main line to staging.

Staging yard entrance. The reversing loop climbs up and over the staging yard.

Staging yard entrance. The reversing loop climbs up and over the staging yard.

No comments yet

Leave a Reply

You must be logged in to post a comment.